Section 6417 Direct Pay by State

State Solar Incentives, and the One That Pays You

Each page below sets out what the state actually pays, who it pays, and how those programs stack with the federal credit. One finding held in every state we checked: no state income tax credit for solar reaches a nonprofit, church, school or county. The federal credit does, and under Section 6417 it is paid in cash.

Request a Scoping Review

Solar has to be in service by December 31, 2027

Section 48E(e)(4), added by the 2025 tax act, says the credit “shall not apply to any qualified property placed in service by the taxpayer after December 31, 2027” where the facility is wind or solar. That termination reaches facilities whose construction began after July 4, 2026, which was three months ago. So unless your project was already under construction by then, the question is no longer whether you can start in time. It is whether you can be generating by the end of 2027, with interconnection, an executed agreement, permitting, procurement and construction in between.

Beginning of construction is now size-gated

Notice 2025-42 makes the five percent safe harbor available only to solar with maximum net output of 1.5 MW AC or less. Above that, physical work is the only route. This is a size test, not an entity test, and we see it misdescribed as a nonprofit carve-out.

Storage is not on this clock

Section 48E(e)(4)(C) excludes energy storage technology placed in service at the facility from the termination. A project that cannot make the solar window may still have a storage path.

Geothermal heat pumps are a different section

Ground source heat pump property stays in Section 48 with construction beginning before January 1, 2035. If that is your project, this deadline is not yours.

Tell us your placed in service date, or your expected one, and who owns the system. That is enough for us to tell you whether the calendar still works and what the credit is worth.

Check my timeline

Four steps, and one of them has a queue

Step 1Confirm you own it

Elective pay reaches the owner of the energy property. If a developer owns the system and sells you power, the credit is theirs. This is settled before any tax analysis begins.

Step 2Price the credit

Eligible basis, the base rate, and every bonus the project can actually document. Sitework, roofing and interconnection are not automatically in basis, and an invoice total is not an eligible basis.

Step 3Register with the IRS

Pre-filing registration through IRS Energy Credits Online, one number per property. The IRS works these in the order received and does not expedite. Leave the number off the return and the election is ineffective.

Step 4File the return

Form 990-T carrying the election, with Form 3468 and Form 3800, and Form 7220 where prevailing wage and apprenticeship apply. An enrolled agent signs it and holds your Form 2848.