Is Your Domestic Content Threshold 40% or 55%?
If an engineer handed you a domestic content percentage and you are trying to work out whether it passes, settle which Code section the project sits in first. The two do not use the same pass mark.
The 40, 45, 50, 55 ladder that tops out at 55 percent is a Section 48E rule. Under Section 48 the number is 40 percent. Nothing in current law changes it before that credit’s construction start window closes at the end of 2034.
That matters most for geothermal heat pumps, the main technology still claiming Section 48. A heat pump project starting construction in 2031 answers to the same 40 percent as one that started in 2023. A comparable Section 48E project answers to 55.
Section 48 sets the bonus size and hands off the test
Read Section 48(a)(12) looking for a threshold percentage and you won’t find one. The paragraph sets how big the bonus is, 2 or 10 percentage points, and then hands the test itself somewhere else. Subparagraph (B) says only that “rules similar to the rules of section 45(b)(9)(B) shall apply.”
Follow that cross-reference. Section 45(b)(9)(C) says the adjusted percentage “shall be 40 percent,” or 20 percent for an offshore wind facility. No table and no phase-in.
That hand-off is where the confusion starts. The threshold is two cross-references away from the provision people actually read.
Section 48E started escalating in July 2025
Section 48E did not always climb. As the Inflation Reduction Act wrote it, Section 48E(a)(3)(B) was a single sentence pointing back at Section 48(a)(12), which made it flat at 40 percent too. The escalating ladder lived in Section 45Y(g)(11)(C), the production credit cousin.
Section 70513(d) of P.L. 119-21 rewrote Section 48E(a)(3)(B) in July 2025 and gave it a mid-year first boundary that Section 45Y does not have.
| Construction begins | Section 48E | Offshore wind |
|---|---|---|
| Before June 16, 2025 | 40% | 20% |
| June 16 through December 31, 2025 | 45% | 27.5% |
| Calendar year 2026 | 50% | 35% |
| After December 31, 2026 | 55% | 55% |
Two details in that table get misquoted. The first boundary is June 16, 2025, not January 1, so projects that started construction between January 1 and June 15 of 2025 are at 40 percent rather than 45. The final tier carries no separate offshore wind figure, so offshore wind takes 55 as well. The 45 percent offshore tier people cite for 2027 belongs to Section 45Y. It has no counterpart here.
Section 48 and Section 48E compared
| Section 48 | Section 48E | |
|---|---|---|
| Provision | 48(a)(12) | 48E(a)(3)(B) |
| Where the number lives | Section 45(b)(9)(C), by cross-reference | In 48E(a)(3)(B) itself |
| Threshold | 40%, flat, every year | 40 / 45 / 50 / 55 by start date |
| Offshore wind | 20%, flat | 20 / 27.5 / 35 / 55 |
| Escalates? | No | Yes, since June 16, 2025 |
| Bonus size | +10 points if the project meets Section 48(a)(9)(B), +2 if not | +10 points at the alternative rate, +2 at base |
| Main technology still using it | Geothermal heat pumps | Zero emissions generation, plus storage |
| Foreign entity sourcing rules | Not imposed on Section 48 property | Apply |
| Elective safe harbor tables | Same tables, but no geothermal heat pump project type is listed in them | Same tables |
One row deserves a second look. Section 48’s bonus is 10 points where the project meets Section 48(a)(9)(B), and that test is satisfied three different ways: prevailing wage and apprenticeship, a construction start before the sixty day guidance date, or a project under 1 megawatt of electrical or thermal energy. The ceiling is 3.4 million Btu per hour of heating or 284 tons of cooling, taking whichever rate is greater, so many church and smaller school jobs clear it on size alone without any wage compliance at all.
The percentage is also only one of two tests, which is worth saying plainly because the number an engineer hands you answers half the question. The steel and iron test runs alongside it, it is pass or fail, and it has no percentage and no partial credit. A project at 48 percent domestic cost with an imported steel or iron structural component still fails. Both tests are worked through in what the domestic content bonus actually requires.
Which section is your technology in
Still Section 48, for construction beginning before January 1, 2035:
- Ground source heat pumps, meaning equipment using the ground or ground water as a thermal energy source to heat a structure or as a thermal energy sink to cool a structure
Section 48 for construction that began before January 1, 2025, and closed to new starts since:
- Solar, geothermal deposit equipment, fuel cells, microturbines, combined heat and power, small wind, waste energy recovery, energy storage, biogas, microgrid controllers
Section 48E, for qualified property placed in service after December 31, 2024:
- Solar photovoltaic, wind, geothermal electricity generation, hydropower, nuclear, marine and hydrokinetic, and other generation at zero greenhouse gas emissions
- Energy storage technology, including standalone storage
- Fuel cell property, for construction beginning after December 31, 2025, at a flat 30 percent that takes no adders
A campus running a heat pump loop alongside a rooftop array has one site and two sections, answering to two different thresholds in the same filing year. That split is the single most common surprise in this area.
Geothermal heat pumps are not a Section 48E qualified facility
Section 48E reaches a facility “which is used for the generation of electricity.” A geothermal heat pump moves heat into or out of the ground. It generates no electricity, so the heat pump equipment itself is not a qualified facility under Section 48E(b)(3)(A). Which credit your project claims is settled by that, not by preference.
Its runway sits in Section 48(a)(3)(A)(vii): construction has to begin before January 1, 2035. The credit rate steps down near the end under Section 48(a)(7), at base rates of 6 percent for construction beginning before January 1, 2033, then 5.2, then 4.4. With the five times multiplier those are 30, 26 and 22 percent.
These two schedules get welded together constantly. 2032 is the last year you can start construction at the full 30 percent rate, which is a credit rate boundary and nothing else. The 40 percent threshold is the same in 2032, in 2034, and in every year between.
The 2025 law also zeroed the residual energy percentage in Section 48(a)(2)(A)(ii) for construction beginning on or after June 16, 2025, and barred any increase to it. Geothermal heat pumps are not in that bucket. They sit in the clause above it and keep both the credit and the bonus.
Domestic content can also reduce the elective payment itself
Everything above is about the bonus. For an organization taking the credit as cash under Section 6417 direct pay, the same percentage answers a second question, and failing that one can cost the whole credit rather than the ten points. Domestic content is tested once and answered twice.
Sections 45(b)(10), 48(a)(13), 45Y(g)(12) and 48E(d)(5) impose domestic content as a condition on the payment. Fail it and the entire credit is multiplied down, not just the bonus portion.
The four tier schedule is written out in Section 45Y(g)(12)(C) and reaches Section 48E through Section 48E(d)(5). Section 48(a)(13) imports Section 45(b)(10) instead, and that schedule stops at 90 percent for calendar year 2024 construction.
| Construction begins | Applicable percentage under 45Y(g)(12)(C) and 48E(d)(5) |
|---|---|
| Before January 1, 2024 | 100% |
| Calendar year 2024 | 90% |
| Calendar year 2025 | 85% |
| After December 31, 2025 | 0% |
That last row is not a reduced credit. It is zero.
Two limits keep most projects clear of it. The applicable percentage is 100 percent for a facility with maximum net output of less than 1 megawatt measured in alternating current, and the condition reaches only applicable entities, meaning organizations claiming elective pay. A taxable owner of the same array never sees this rule.
Meeting an exception protects the payment and earns you nothing
Two statutory exceptions set the applicable percentage back to 100 percent, and neither earns a point of bonus. One applies where domestic sourcing would raise overall construction cost by more than 25 percent. The other applies where the relevant steel, iron or manufactured products are not produced in the United States in sufficient and reasonably available quantities or of satisfactory quality.
Under Notice 2024-9 as extended by Notice 2024-84, an applicable entity claims these by attesting, under penalties of perjury, that it has reviewed the requirements and made a good faith determination that it qualifies for one or both. The attestation has to be signed by someone with legal authority to bind the organization in federal tax matters and attached to the Form 3468 or Form 8835 filed to make the Section 6417 election. Section 6001 recordkeeping applies to the determination behind it.
The exception sets the applicable percentage to 100 percent. It says nothing about the bonus provisions. An organization that attests gets its full base credit paid in cash and earns no domestic content bonus at all. Those are separate claims on separate lines, each with its own supporting statement.
Internally, ask two questions. What is our applicable percentage, and separately, did we earn the bonus.
The zero percent cliff is not currently live
Notice 2024-84 extends the attestation to property the construction of which begins before the later of January 1, 2027 or the issuance of further guidance. No further guidance has issued.
The window is the later of that date or further guidance, so it may run past 2026. Anyone describing the cliff as having closed on January 1, 2026 is reading a schedule without the transition relief sitting on top of it.
If construction starts before 2027, the attestation is worth settling early. It turns on whether the organization can make a good faith determination that it qualifies for one of the two exceptions, not on whether the project would have hit the domestic content percentage, and the records behind that determination have to exist and be kept. Where it holds, it answers the applicable percentage question without regard to actual domestic content. It does not earn the bonus, which is a separate analysis.
What to confirm before filing
Step 1Identify your section
Geothermal heat pumps are Section 48 at 40 percent. Electricity generation and storage placed in service after 2024 are Section 48E on the escalating schedule. The answer changes your pass mark, not your math.
Step 2Fix the construction start date
Both the threshold and the applicable percentage key to it, and Section 48E uses a June 16, 2025 boundary that calendar year assumptions will miss.
Step 3Run both tests, not one
Steel and iron is pass or fail. The cost percentage is separate. The elective safe harbor tables cover ground mount and rooftop solar photovoltaic, land based wind and battery energy storage only, so a geothermal heat pump project has no assigned cost table and is costed directly under Notice 2023-38.
Step 4Answer the two questions separately
Applicable percentage first, since that governs whether the payment arrives intact. Bonus second. An attestation answers the first and not the second.
Deep Dive, 8 pages. ITC Bonus Credits: What Raises the Rate, and What Can Take It Away covers the energy community, domestic content and low-income provisions, how they stack, and why domestic content becomes a payment condition rather than upside once a project reaches 1 MW AC.
Have a project and a deadline?
GreenFile Advisory handles the tax side of Section 48 and Section 6417 direct pay: eligibility confirmation, eligible basis studies, IRS pre-filing registration, and the Form 990-T with the elective pay election. We handle tax filing and substantiation, working alongside your installer and financing team.
This article is general information, not tax advice, and it reflects IRS guidance as of November 14, 2026. Deadlines and eligibility depend on your organization's tax year and entity type. Please confirm your own facts with a qualified tax professional before relying on anything here.